Supply and Installation of wooden pergola fabricated with Solid African teak treated with heat & moisture. The pergollas are installed vertically and horizontally near the swimming pool. The horizontal pergollas are covered with fabric shade . The vertical pergollas are fixed in ground with associated civil works.
Supply & Installation of 6 No's of CHW FCU's in Lobby Area, JCH. Supply and installation of Upgraded Chilled Water FCUs in the Lobby Area at Jumeirah Creekside Hotel as below mentioned. Removal of the existing 3 no's number of FCU feeding to Lobby area and hand over to engineering store and Install new 3 no's FCU in new location that Lobby Backside Pantry and Office above ceiling area and the related ceiling modification works will be carried out as if required. Supply and installation of FCU hanging accessories such as spring isolators, Ceiling anchors and GI Threaded Rod with nut bolts: FCU Brand-Trosten (UAE), Type: Chilled Water Fan Coil Unit (FCU), FCU Capacity: 3600 CFM, Total FCU Quantity- 3 no's.
Replacement of 4 No's of FAHU's in Jumeirah Village. Maker FAHU model number: 23MK1013 (New Version). FAHU Compresses of: Panel Filter- Synthetic washable type (EU -4), Body: 60mm thick double skin casing with injected polyurethane foam insulation, Inner wall 0.6 mm thick plain galvanized steel sheet and outer wall 0.6 mm polyester pre-coated steel sheet, Bag filter installed on supply side (EU-7), EN 779, Cu tube - aluminum fins cooling coil with copper header. The coil section shall include galvanized steel drain pan, Electrical heater provided for the unit, Backward curved DIDW centrifugal fan, belt driven type, 4Pole, TEFC, Class -F-insulation, IP55 motor.
The system comprises of 2 nos. of 300 TR Air Cooled Screw chillers, 3 nos. of Package units and 118 nos. of Ducted Split units with necessary ducting and CHW piping works. The mechanical ventilation scope includes the supply and installation of ducted inline axial fans with necessary fire rated ducting.
Design, Supply & Installation of Chilled Water Pressurization Units in Oasis Village. Supply and installation of 166 no's Chilled Water FCU of different CFM (The heat load calculation for the area will be submitted mentioning the Total Cooling Capacity, Sensible Cooling Capacity, Air Flow (CFM) and Chilled water flow for the concerned Authorities verifications and approval of Engineering HOD prior to the start of the works. Fabrication, supply and installation of GI duct with insulation (24guage GI sheet and 13mm thick elastomeric rubber sheet insulation, Aluminum foil faced) for mouth connections.
Design, Supply & Installation of Plate Heat Exchanger for potable water tank in Westin. Supply and install hot water tank Calorifier storage volume 2000 liters, 2 hours recovery time, 35-c to 70-c Operating Temperature. Supply and install a new Calorifier. Thermostatic control & thermal cut off. The Calorifier can be either vented from the secondary flow connections of a dedicated vent connection which allows air to exit the Calorifier, air to enter the Calorifier during drain down and also thermal expansion of the water when heating pump up. The vent connections or pipe should never be blocked or valve off with exception to vent/bypass valves on multi Calorifier installations.
Replacement of Extraction system in Car park area, Burj Al Arab Hotel. Supply and installation of the New Extraction Fan (Higher capacity of old fan) = 1 no, Fan Unit Details: Type: Tube Axial Fan, Brand - WOLTER (Germany, EN-12101-3 Certified, Civil Defence Approved, 2 Hrs) / Equal standard: Fan Model Number: AXV-ST 660-4/18- LH/2 112-2, Motor: 5kW 400-C, Capacity: 10000 CFM (Location : B-1 Entrance). Fabrication, supply and installation of the Sound attenuator with size of L-1000mm x OD-750mm = 2 no''s. Fabrication supply and installation of the Electrical Control Panel for the newly Proposed Extract Fan control panel consist of ELCB, MCB Contactors & Control Relays.
Re-Insulation of CHW pipeline at Mina A Salam Hotel, Madinat Jumeirah. Cleaning the pipeline and Supply, applying metal primer on the CHW pipeline prior to insulation works if required. Supply and installation of the new Insulations in place of old items with 40mm thick polyisocyanurate pipe insulation. Insulation density will be - 48-50kg/m, covered with 08 oz canvas cloth dipped in vapor barrier / Anti-fungal protection. Supply and applying of Single layer, 08 oz canvas cloth. Supply and applying of Single layer, Foster 30/36, Vapor barrier coating.
Fabrication, Supply & Installation of SS Baffle Partition in underwater lagoon in Madinat Jumeirah Resorts. The proposed Baffle partition will be fabricated with 316, Stainless Steel Materials such as Structure frame by Square tube and Angles. All Bolts, plates and Anchors will be 316, Stainless steel. Size of the Baffle Partition: 5.0m length x 2.3m height (Single line). The SS Baffle partitions panel size: 50cm width panels x 10 no's and double joint with 100mm x 10mm thick flat bar, fastened by SS, 316 Nut & Bolts. The proposed partition will be fixed to the side wall and lagoon roof slab with 316 grade Stainless steel Anchor bolts (Anchor bolt make: Hilti, HST M12).
Fabrication, Supply and installation of Mesh cage partition for store to divide into 5 separate rooms, consist of main frame angles and covered by expanded metal sheet with anti-corrosion coat paint. The material used for the fabrication is 3.2mm MS expansion metal sheet covering a total area of 211 m2
Fabrication, Supply & Installation of Stainless Steel Cold water tanks & Stainless Steel Electric Calorifier water tanks for Madinat Jumeirah. Fabrication, supply and installation of new insulated Cold Water Tanks and carrying out related MEP works. Supply and installation of 5.0mm thick EDPM gasket (WRAS approved) for the Shell access panel / Manhole. Supply and installation of the isolation valves, NRV, Pressure and Temperature gauge and the Air vent. All the valve accessories make: Pegler (Hot Application, UK) / equivalent model. Fabrication, supply and installation of new insulated Stainless Steel Calorifier Water Tank as existing same model and carrying out related MEP works.
Fabrication, Supply & Installation of Stainless Steel bollard poles 4” ø, 2.0mm thick Stainless Steel Pipe with 5mm thick SS sheet base frame, 316 grade SS materials, External Finish Mirror / Brush Finish. Fabrication and installation of the SS floor insert brackets. Fabricate and provide the Countersunk Screws in the base plate and provide 316, L grade Stainless steel Screws.
Fabrication, Supply & Installation of grease trap covers in B2 and inlet water lines. The scope of work included replacing of outer shell of Grease Traps with Stainless Steel 316 covers, replacement of all related waste pipe lines with new in the B2 area from grease tap inlet lines and outlet lines to main header , Disconnect and Dismantling of existing water pipe lines without any disturbance of kitchen operations
The scope of work includes supply and installation of 300mm x 4C x XLPE/SWA/PVC/CU Cable along with 150mm x 1C Earth cable for a length of 450 meters between Le Meridien Chiller Yard to Busolla SMDB. The associated works included 190 meters of cable tray installation, civil works such as Interlock removal and re-installation, excavation with a depth of 1 meter, electrical warning tape laying and backfilling and compaction. Electrical tests such as the megger test are being carried out. All required HSE guidelines were compiled during work execution.
The work was to replace the existing main electrical power cable (XLPE/SWA/PVC/CU 240mm X 4 core armored cable) for Main screen at Meydan Grandstand to new along with its termination and connection.
The scope of the work is fabrication, supply and installation of 8 no’s of custom made electrical DB’s at office tower. The DB’s are with 160 amps MCCB rating. Laying and termination of incoming and outgoing cables as per standards. Tagging and labelling, update of load schedule etc are carried out as per scope.
Fabrication, Supply & Installation of 4 No's of Electrical flood light poles (6 No's). LED Light details: NOVEX (UK), Flood Light, 50 watts, 220-240 volts x 1 ph, IP-65.The light pole fabricated with Mild Steel Square tubes and Powder Coated paint protected. The light poles having its own electrical control boxes (hidden) behind the light pole bottom side and provide individual circuits for lights with necessary control components such as ELCB & MCB.
The scope of work includes supply and installation of 300mm x 4C x XLPE/SWA/PVC/CU Cable along with 150mm x 1C Earth cable for a length of 450 meters between Le Meridien Chiller Yard to Busolla SMDB. The associated works included 190 meters of cable tray installation, civil works such as Interlock removal and re-installation, excavation with a depth of 1 meter, electrical warning tape laying and backfilling and compaction. Electrical tests such as the megger test are being carried out. All required HSE guidelines were compiled during work execution.
The scope of work includes supply and installation of 300mm x 4C x XLPE/SWA/PVC/CU Cable along with 150mm x 1C Earth cable for a length of 450 meters between Le Meridien Chiller Yard to Busolla SMDB. The associated works included 190 meters of cable tray installation, civil works such as Interlock removal and re-installation, excavation with a depth of 1 meter, electrical warning tape laying and backfilling and compaction. Electrical tests such as the megger test are being carried out. All required HSE guidelines were compiled during work execution
Design, Supply & Installation of AC, Extraction system and MEP works at 40 food trucks for various Meraas Last Exit projects, Dubai. Supply and installation of interconnection refrigerant pipelines (1/2”ø & 1/4”ø) along with rubber insulation and pipelines: maximum 10-12 meter distance. Supply and installation of Single phase Electrical Power Cabling (220-240 volt) consist with GI flexible conduit and Isolator. Power supply taken from main DB near the Truck. Supply and installation of ¾” drainage pipelines (U’ PVC) with rubber insulation and connection to the nearest drainage point. Carrying out the AC unit’s Electrical Control Cabling with 1.5mm rubber cable and 20mm GI Flexible Conduit.
Supply & Installation of GRP water tank (hot press) at Meydan Stables. Fabrication, Supply, Installation and Commissioning of New 6000 gallon GRP Water Tank as per below given details at Green stable tank shed by removing the shed roof & tree branches and re-fixing the shed roof back in place. Fabrication, supply and installation of External ladder with Hot Dip Galvanized pipes. Supply and installation of 4” NRV (Pegler): 3 no. Leakage testing of water tank by filling the full tank of water for 24 hours RFIA will be submitted to concern Meydan Representative for all materials approval & Inspection of works
This work is being executed as three phases; Phase 1 is the replacement of damaged steam water condensate tank with a new one which is fabricated with stainless steel 316 grade, size of 136 cm x 136 cm x 131cm covered with 2 layers of fiberglass insulation cladding of 1.5 mm Aluminum sheet. Phase 2 is replacement of damaged hot water lines with new stainless steel 316L SCH40 ERW pipes with sizes 3” and 2” dia along with all necessary valves, fittings and gauges. The length of the pipe is approx 40 meters, covered with rock wool insulation and aluminium cladding. Phase 2 included supply and installation of new stainless steel 316L ERW SCH40 pipe with size 4” for a total length of approx. 270 meters with necessary flanges, valves, elbow and other fittings. Phase3 included supply and installation of plate heat exchanger along with its MS plinth, valves, gauge and pipe connection.
Fabrication and Replacement of 6 No's of SS Grease Traps for Main Kitchen at Burj Al Arab Hotel. Replacing the outer shell of Grease Traps with Stainless Steel 316 covers. Replacement of all related waste pipe lines with new in the B2 area from grease tap inlet lines and outlet lines to main header (Pipe sizes: 2” ø, 3”ø & 4”ø PVC Pipes, Pipe make- Atlas Star, UAE). Disconnect and Dismantling of existing water pipe lines without any disturbance of kitchen operations. All kinds of civil works are included in our scope with supply & installation related materials. Testing and commissioning and handing over the entire system. All the works will be planned without disturbance of Current Operation. Size and Quantity of the Grease Trap: 1000mm x 650mm x 90mm L = 6 no’s. Materials of the Grease Traps: Grease Trap Body - 3.0mm thick Stainless Steel Sheet, 316 Grade.
Replacement of Potable water pump system header replacement (GRP) in Jumeirah Oasis Village. Supply and apply the full lamination coating in the internal surfaces joints of GRP Water tank with proposed GRP Lining wall Thickness: 5.0mm Tank size: 28.0m L x 20.0m W x 3.0m H with single internal partition. Supply & applying 4mm thick UV lamination coating with Isophthalic Resin and over lapped with 1.0 mm Thick UV Coating (Gel Coat) inside the water tank = Total 5mm thick. Supply and installation of the M-12, SS, and 316, Nut, Bolt, and Plate Washer & Long nut connector for the Tie rod reinforcement.
Replacement of central air conditioning condenser water GRP header (600mm) and E-Class UPVC water line replacement work at Merkato Mall
Design, Construction of 4 No's of Rain water Lifting station in Bab Al Shams Hotel. Constructing the rain water lifting station with RCC wall (C40/20 SRC RMC with A393 10mm single Layer Mesh) Size: 1.3m x 1.3m x 1.5m Depth = 1 no. Taking the single phase electrical power supply from near the Electrical room with supply and installation of the 6mm x 3 core + Earth Cable Armored cable and IsolatorTotal Length: Approx - 40 meters.
Design, Construction of 4 No's of Rain water Lifting station in Bab Al Shams Hotel. Constructing the rain water lifting station with RCC wall (C40/20 SRC RMC with A393 10mm single Layer Mesh) Size: 1.3m x 1.3m x 1.5m Depth = 1 no. Taking the single phase electrical power supply from near the Electrical room with supply and installation of the 6mm x 3 core + Earth Cable Armored cable and IsolatorTotal Length: Approx - 40 meters.
Supply and Installation of wooden pergola fabricated with Solid African teak treated with heat & moisture. The pergollas are installed vertically and horizontally near the swimming pool. The horizontal pergollas are covered with fabric shade . The vertical pergollas are fixed in ground with associated civil works. #5.5 Project Name: Development of Void area into store room and workshop Year: 2018 Client: Jumeirah Al Naseem Hotel
The scope of works included Supply and Installation of kitchen equipment such as charcoal grill equipment, dishwasher (Winter Halter), SS tables and shelves, Ice machine etc along with Kitchen hood with fire suppression system. HVAC works such as supply & installation of FAHU, fire rated smoke Extraction system with necessary ducting is part of the scope. Civil works includes raising the floor, modification of sheesh preparation area into female toilet, application of new floor and wall tiles etc. Electrical works included installation of new SMDB as per the requirement along with supply & installation of power cable from LV room to MDB panel room. As this work is modification of the type of restaurant, obtaining necessary approval from DM & DCD was part of the scope. The duration of the project was 60 days.
The scope of works included Supply and Installation of 2.5Tr Split AC Units, exhaust fan, electrical works such as cabling, Isolators Installation, Plumbing works such as supply and installation of drainage line, traps, isolation valves, etc. The wash rooms were refurbished with new WC, urinal bowl, wash basin, cold & hot mixer tap, SS sink, soap dispenser, hand sprays, and floor tiles etc. Necessary civil works being carried out to facilitate drainage line and flooring works.
The work includes complete refurbishment of Kitchen including Civil works, floor epoxy application, electrical up gradation works etc. along with supply & Installation of Electric Kitchen equipments. Up-grade the electrical power load in the Kitchen SMDB feed from LV Panel 3 by laydown additional armored cable and existing DB replacement. Using existing 240mm x 4 core armoured cable with new armoured cable for upgraded power supply (630 amps). Supply and laydown new 1 x 240 mm² armoured cable + 1 x 120 mm² earth cable from the LV Panel 3 to EAHM G-floor Electrical Room through underground as per DEWA specification guidelines, cable will be laid down after the Megger testing by factory.
The work includes civil works, drainage network up-gradation, and other related plumbing works. Design, Supply and Installation of Water Supply system for kitchen equipment with required modification of the existing water line. Supply and installation of the ½” ø Angle Valves (RAK / PEX) in the wall at Charcoal room and provide the flexible pipes for the equipment’s. Fabrication, supply and installation of the 316 grade Stainless steel Gratings and mesh as per requirement, Grating thickness: 3.0mm, Mesh Tray Hole size: 2.0mm, Gratings Frame: 3mm SS angle.
The scope of work includes roof paneling, civil works, electrical and necessary modification to refurbish the Kids Play Area in Rixos Hotels, Al Marjan Island, Ras Al Khaimah. Supply and installation of new stainless steel support with countersunk screw and with clamp holding between the glasses to make the glass rail straight SS 316 10cm x 5cm flat bar supports 1 mtr height & 8 nos. All kinds of civil works are included in our scope of works related to the job, and hand over the area to operate. Remove all the debris and clean the work area on completion of entire works and take away the materials deposited to the debris area
Hospitality Work Description: Supply & Installation of firefighting system along with DCD approval for Barasti Bar in le Meridien Mina Seyahi Hotel. Supply and application of Water Based Fire Retardant Coating at Barasti and Beach Shacks: Qty – 4620 m² area approximate, 4 Layers x 260 Microns Fire Retardant Varnish and One layer of Top Coat (Clear) and provide all related DCD Certification for Three Years. Providing all kinds of Machinery, Man Power, Tools, Ladders, PPE materials and other tools for work execution and completion. Providing the work method statement & Risk assessment, work Schedule, material submission, warranty certificate, commissioning & completion reports
Design, Supply & Installation of AC, Extraction system and MEP works at 40 food trucks for various Meraas Last Exit projects, Dubai. Supply and installation of interconnection refrigerant pipelines (1/2”ø & 1/4”ø) along with rubber insulation and pipelines: maximum 10-12 meter distance. Supply and installation of Single phase Electrical Power Cabling (220-240 volt) consist with GI flexible conduit and Isolator. Power supply taken from main DB near the Truck. Supply and installation of ¾” drainage pipelines (U’ PVC) with rubber insulation and connection to the nearest drainage point. Carrying out the AC unit’s Electrical Control Cabling with 1.5mm rubber cable and 20mm GI Flexible Conduit.